There has been a lot of activity at the new Chapman house lately. All the walls and cabinets are painted, the island is stained and the counter tops are ready for completion. In the next few weeks they will be installing lighting fixtures, toilets, bath tubs, nobs and pulls for cabinets, remaining flooring and all counter tops. This means were are on the home stretch and we should be moving in sometime at the end of January or early February.
Here are a few pictures of the paint colors!
Kitchen:
Living Room:
Entry from living room to kitchen area:
Dining Room:
Thursday, December 31, 2009
Saturday, December 12, 2009
Feels like home.
Monday, December 7, 2009
Waiting Waiting Waiting......
I realized this afternoon that I have not posted in 3 weeks.
There is not much to post as the only thing "visually" complete is sheetrock. However, my cabinets are finally ready to be installed (still at the cabinet maker's shop) and the trim is ready to be shipped. The only thing we are waiting on...the weather! So, hopefully the weather will cooperate and we can move forward.
6 weeks and counting?
P.S. I bought my first piece of furniture for the new house. yipee!
There is not much to post as the only thing "visually" complete is sheetrock. However, my cabinets are finally ready to be installed (still at the cabinet maker's shop) and the trim is ready to be shipped. The only thing we are waiting on...the weather! So, hopefully the weather will cooperate and we can move forward.
6 weeks and counting?
P.S. I bought my first piece of furniture for the new house. yipee!